O-Train West

Updated on April 22, 2024

Line 1 & Line 3



 

Overview

The O‑Train West extension is the third stage of the project.

We’re extending Line 1 from Tunney’s Pasture to Algonquin. New Line 3 will connect Trim with Moodie. The extension adds 15 kilometres of rail and 11 new stations. It will bring rail service to communities like Centrepointe, Westboro, Lincoln Heights, and Bayshore. Plus, it grants easy access to outdoor gems like Westboro Beach and Wesley Clover Parks. The O‑Train West connects to the Transitway for speedy service to Kanata and Barrhaven.

Highlights

  • 15 km of new rail and 11 new stations
  • New O‑Train Line 3 connects Trim to Moodie
  • Direct connection to Algonquin College
  • Lincoln Fields station is the transfer point between Line 3 (to Moodie) and Line 1 (to Algonquin)
  • O‑Train service to Island Park, Westboro, Laurentian, Woodroffe North, Woodpark, Lincoln Heights, Whitehaven, Queensway Terrace North, Bayshore, Iris, Centrepointe, and Lincoln Heights
  • Seamless connection to green spaces like the Ottawa River pathway, future Linear Waterfront Park by the National Capital Commission, Westboro Beach, and Pinecrest Creek Corridor

West: Line 1 west extension to Algonquin and Line 3 to Moodie run parallel from Trim to Tunney's Pasture, passing through Westboro, Kichi Zibi, Sherbourne, and New Orchard. They split at Lincoln Fields Station. Line 1 continues to Iris station, towards Algonquin, while Line 3 goes on to Queensview, Pinecrest, Bayshore, ending at Moodie. Landmark route map of the O-Train west extension showing all the stops listed in the Line Routing, including such stops as Tunney's Pasture, Lincoln Fields, Moodie, and Algonquin.


 

Key figures

1
New O‑Train Line
11
New Stations
15
Kilometres of New Rail


Key connections

Bayview Station

A graphic map showing Bayview as the transfer station between O-Train line 2 and Line 1


Bayview Station page

Lincoln Fields Station

A map showing Lincoln Fields Station as the last transfer point between Line 1 and Line 3


Lincoln Fields Station page


Line

 

Tunney’s Pasture – Algonquin



 

 

Overview

Extending Line 1 from Tunney's Pasture to Algonquin adding 7 stations along the way

With the west extension, Line 1 will stretch west beyond Tunney's Pasture to Algonquin. Seven new stations will be added along the way.

You will be able to travel from Trim in Orléans to Algonquin College and the Nepean area, without leaving your seat.

 

Highlights

  • Identified by the familiar red circle on maps and signs
  • A total of 20 stations
  • Includes 7 brand new stations
  • 5 Park & Ride lots along the line
  • Runs on the same track as Line 3 between Lincoln Fields and Trim stations
  • Direct connection to Algonquin College
  • 100% electric Alstom Citadis Spirit vehicles, for a quiet ride with zero emissions
7
New Stations
8.5
Kilometres of Rail
2
Schools connected



Bus icon

Linked to the bus and Para Transpo

Train icon

Transitway connections to Kanata and Barrhaven

Train icon

Linked to VIA Rail station

Bridge icon

4 Pedestrian bridges





Are you interested in the O‑Train Extension?

Don’t miss an update. Subscribe for the latest project updates and construction news.

Subscribe

Line 3

 

Tunney's Pasture – Moodie



 

 

Overview

Line 3 is the newest addition to the Ottawa O‑Train network. It provides a swift, continuous route from Trim in the east to Moodie in the west.

Line 3 features modern and well-situated O‑Train stations. It will provide frequent service, unaffected by traffic conditions.

O-Train Line 3 will run parallel to the extended Line 1 for most of its route, splitting at Lincoln Field and continuing west towards Moodie station.

Highlights

  • Spot Line 3 with its signature gold circle symbol
  • A total of 27 stations
  • Includes 9 brand new stations
  • 37 km of rail across the city
  • Runs parallel to Line 1 for most of its route
  • Go from Orléans to Nepean with zero transfers
  • Transfer between Lines 1 and 3 at Lincoln Fields Station
  • 4 Park & Ride lots
  • 100% electric Alstom Citadis Spirit vehicles, for a quiet ride with zero emissions
  • New maintenance and storage facility at Corkstown Yard, near Moodie Station
9
New Stations
4
Park & Ride Lots
37
Kilometres of rail



Plane iconTrain icon

Linked the airport and VIA Rail

Bus icon

Linked to the bus and Para Transpo

Bridge icon

2 Pedestrian bridges




Are you interested in the O‑Train Extension?

Don’t miss an update. Subscribe for the latest project updates and construction news.

Subscribe