Skip to content

Changes at Bayview starting Aug. 28

Bayview Station

On Wednesday, Aug. 28

The O-Train Line 2 platform is moving to the lower level of new Bayview Station. Use the north underpass entrance access the platform. You will find fare gates and ticket machines at the entrance.

Bus stop names are changing but service will remain the same. Stop 1A becomes Stop A and Stop 2A is renamed Stop B. 

Bayview Station layout

When Line 1 opens on Sept. 14

The full lower level, including public washrooms, will open. Bayview Station’s upper level will open.

A second entrance will open on the north side of Albert.

Stop A will move slightly west to its final location. Stop B will not change until construction on the Trinity Development is complete in 2020-2021.

Need help finding your way?

Look for signs inside the station and on connecting pathways.

OC Transpo staff will be there to assist you.