Skip to content

New Multi-Use Pathways - Stage 2 East Extension

Image - New Multi-Use Pathways - Stage 2 East Extension

As part of the Stage 2 Project, new Multi-Use Pathways have been opened along the O-Train East Extension. We are excited to open these new connections in the east! 

The image is of a map, with Line 1 shown in red. The new pathways are shown in blue, with blue labels.

The image is of a map, with Line 1 shown in red. The new pathways are shown in blue, with blue labels.

The image is of a map, with Line 1 shown in red. The new pathways are shown in blue, with blue labels.