Skip to content

Notice of Overnight Work and Road Closure: Baxter Road - September 29

Image - Notice of Overnight Work and Road Closure: Baxter Road - September 29

As part of the Stage 2 O-Train Light Rail Transit (LRT) project, a section of Baxter Road east of the Ikea access, parallel to the south side of Highway 417, will be fully closed to traffic overnight.

What:          
Baxter Road will be fully closed overnight, east of the Ikea access, parallel to the south side of Highway 417. Emergency access to the business park on the east side of Baxter Road will be maintained, but general access to these properties will be closed during this work.

When:         
Monday, September 29 from 11 p.m. to 5 a.m. on Tuesday, September 30.

Why:           
Relocation of temporary concrete barriers (TCBs).

Where:        
Baxter Road, east of the Ikea access, parallel to the south side of Highway 417.

Anticipated Impacts

Residents living in the vicinity of Baxter Road may experience noise from equipment working in the area.

Site lighting for overnight work will be required and crews will place and/or direct the light to mitigate impact on residents.

Motorists should adhere to detours, traffic control signage, posted speed limits, allow for added travel time and use extra caution when moving through active construction corridors as traffic patterns change.

Pedestrians and cyclists should use extra caution and adhere to posted signage when localized detours are in-place, to ensure safety.

The safety of the public and workers is paramount, and we thank you for your patience during construction.

Accessibility

Accessibility is an important consideration for the Stage 2 LRT project. The Stage 2 team makes every effort to provide access through and around construction sites. If you require special accommodation, please contact stage2@ottawa.ca.

West Weekly Night Work Summary

A weekly summary of night work, providing greater detail as to the type and location of activities, is shared at the outset of each week. If you would like to receive the West Weekly Night Work Summary, please email stage2@ottawa.ca, to be added to the distribution list.

Future work is required in this area. Additional construction updates, such as changes to work sequencing and the duration or impact of this work will be communicated via the Stage 2 project e-newsletter. To receive these electronic updates please sign up at octranspo.com/o-trainx and select updates for “Queensview Station”. For other accommodations, or questions, please contact:

Stakeholder Relations,
Rail Construction Program,
City of Ottawa
Stage2@ottawa.ca
octranspo.com/o-trainx

The construction work outlined in this notice is subject to change. Work may be delayed or extended due to weather or other unforeseen circumstances.