As a part of the Stage 2 O-Train Project, the sidewalk on Byron Avenue at Sherbourne Road will be closed to allow for utility installation. A pedestrian detour will be in place during the construction activities.

What: 
Sidewalk closure on Byron Avenue at Sherbourne Road

When: 
As early as Monday, March 23 until Friday, April 3

Why: 
Underground utility works and camera pole installation.

Where: 
Byron Avenue at Sherbourne Road

The image is of a map with the highway shown in yellow. the closure as described above is shown as a red line. the detour described below is shown as a blue dashed line.

Detour Route

Pedestrians will travel eastbound on Byron Avenue to Cleary Avenue, crossing north to Richmond Road and travel westbound on Richmond Road until the pedestrian crossing at 855 Richmond Road.

Anticipated Impacts

Motorists should adhere to detours, traffic control signage, posted speed limits, allow for added travel time and use extra caution when moving through active construction corridors as traffic patterns change.

Pedestrians and cyclists should use extra caution and adhere to posted signage when localized detours are in-place, to ensure safety.

The safety of the public and workers is paramount, and we thank you for your patience during construction.

Accessibility

Accessibility is an important consideration for the Stage 2 LRT project. The Stage 2 team makes every effort to provide access through and around construction sites. If you require special accommodation, please contact stage2@ottawa.ca.

Future work is required in this area. Additional construction updates, such as changes to work sequencing and the duration or impact of this work will be communicated via the Stage 2 project e-newsletter. To receive these electronic updates please sign up at octranspo.com/o-trainx and select updates for “Sherbourne Station”, “Richmond Road Complete Streets”. For other accommodations, or questions, please contact:

Stakeholder Relations,
Rail Construction Program,
City of Ottawa
Stage2@ottawa.ca O-Train Extension | OC Transpo

The construction work outlined in this notice is subject to change. Work may be delayed or extended due to weather or other unforeseen circumstances.