St. Joseph Boulevard from Hart Rd. to Bearbrook Rd. - Westbound Lane Reductions - July 9-23
As part of the Stage 2 O-Train Light Rail Transit (LRT) project, motorists travelling on St. Jospeh Boulevard east of Montreal Road should anticipate impacts to traffic as crews complete necessary construction activities.
What:
Lane reductions on St. Joseph Boulevard westbound from Hart Road to Bearbrook Road.
When:
Wednesday, July 9 from 5:30 a.m. until Wednesday, July 23 at 5:00 p.m.
Note: Two lanes of traffic will be closed daily between 10:00 a.m. and 5:00 p.m. General traffic will use the right turn lane to travel westbound on St. Joseph Boulevard during that timeframe. Two lanes will be available for general traffic at all other times.
Why:
Various scopes that include line painting, temporary asphalt removal, grading, pouring concrete curb, milling, paving, and placing topsoil.
Where:
St. Joseph Boulevard westbound between Hart Road and Bearbrook Road.
The construction work outlined in this notice is subject to change. Work may be delayed or extended due to weather or other unforeseen circumstances.

Anticipated Impacts
Motorists should adhere to detours, traffic control signage, posted speed limits, allow for added travel time and use extra caution when moving through active construction corridors as traffic patterns change.
Accessibility
Accessibility is an important consideration for the Stage 2 LRT project. The Stage 2 team makes every effort to provide access through and around construction sites. If you require special accommodation, please contact stage2@ottawa.ca.
The safety of the public and workers is paramount. Thank you for your patience during construction.
Please note: For your awareness, the following link ottawa.ca/trafficimpacts should be used for updates/changes for traffic impacts (this link is updated on Fridays by 12 noon).
To receive electronic updates please sign up at octranspo.com/o-trainx and select updates for “Jeanne d’Arc Station” and “Montreal Station”. For other accommodations, or questions, please contact:
Stage 2 Team
Stage2@Ottawa.ca
Rail Construction Program | Programme de construction du train léger
Transit Services Department | Direction générale des transports
City of Ottawa | Ville d’Ottawa
octranspo.com/o-trainx | octranspo.com/fr/extension-de-lo-train